provided for
Sir
in
the
estimates.
John (gode's design
likely also.
@ermo
costly
as
regards
workmanship, and
not too
inch
its adoption.
to prove more
labour and
it is probably
to anticipate from
increase of a
an
least 50%
in
the
cost of the
Work
ао
at present estimated.
It would for
of which
considerably less
10
be ov
the
wred
than
that
un
suggested
As
li
allow
of
u inach
of being
arr
amount
Solve
in
a
greater length being built, and
manner
for the
which
proposed
effected
the
of reclamation
which would
really satisfactory
question of protection
waterside property, inst
none
effectually.
curr
of the designo hitherto
be said.
to dent
necessity for
this
reason
alone
olem
lo
be
worthy
consideration erketber
of
be
it may
not-
worth while.
+
to
delay the work
even
now,
until
tho
by
information required
Sir. I. (gode
has
bun
furnished:
it.
dvis
not
Allin
improbable
that.
data
before.
him.
be might
with complete
The
senon's
repairing
thr
invo
breaches
erten.
the
be
Y
www
had very
before next September, recurrence of typhoons looked for, has evidently
great weight with the Egnsulting Engineer, and
doubtful
it is
whether, in the absence
consituation, be would
оз
this
section
be
able
to design
a
have
of
No comments yet.
Private notes are available after approval.